Licensed electrician · PGE 305056

Switchboard Upgrade Adelaide

I'm Marcus. I upgrade switchboards across Adelaide, from old ceramic fuse boxes to three-phase boards with solar. Every circuit gets its own RCBO, so one fault trips one circuit, not the whole house.

Text photos of your board and I'll send you a written quote.

Get a written quote 0468 008 822

  • 5.0 stars from 93 Google reviews
  • Licensed electrician on every job — never handed off.
  • Lifetime workmanship warranty
Finished Hager switchboard with the cover off, every circuit on its own RCBO

What a switchboard upgrade in Adelaide includes

This is what I fit. Your written quote lists each item for your board.

How do I know if my switchboard needs upgrading?

These are the things I find on real Adelaide boards that end in an upgrade.

Not sure? Text a photo of the board with the cover open. I can usually tell you from that.

Safety switch or RCD keeps tripping?

A safety switch (also called an RCD) trips when it sees power leaking to earth. That is its job. The real question is where the leak is.

Often it is an appliance or a wet outdoor power point, and the board is fine. So I find the fault first. I only quote an upgrade when the board itself is part of the problem. Two jobs where it was:

If your power is tripping right now, start with why power keeps tripping or fault finding. If it is unsafe, see emergency call-outs.

What happens on the day of a switchboard upgrade

How long is the power off?

In Erindale (#648) it was up to two hours of a five-hour visit. A three-phase board takes longer. Malvern (#565) was booked as a full day.

Does SA Power Networks come out?

Only when the mains cable or meter needs work. Then SA Power Networks is part of the disconnection and reconnection. Your quote will say if that applies.

Recent switchboard upgrades across Adelaide

Real jobs from this year. Suburb and job number only.

West Lakes #41 · February 2026

An old rewireable fuse board with no safety switch at all. Replaced with a new enclosure, a new main switch and four Hager RCBOs. Every circuit tested, trip-tested and labelled.

Prospect #317 · June 2026

A nine-circuit Scott board on an asbestos panel, found after an emergency repair. The panel was removed under control. A new fire-rated enclosure went in with a main switch and nine Hager RCBOs.

Hillbank #620 · August 2026

A late-night emergency. A 16A breaker had melted and the copper under it was charred. The house has solar, so the board stayed live from the inverter side until that was isolated too. The burnt conductors were cut back to clean copper, and three RCBOs replaced the burnt breaker and the old safety switch.

Royston Park #427 · August 2026

The safety switch would not stay on. All seven circuit breakers were changed to RCBOs and the main switch was replaced. Now a fault trips one circuit, not half the house.

Windsor Gardens #630 · August 2026

Seven breakers changed to RCBOs, a new main switch and busbar, and the meter box brought up to standard ready for solar and a battery. Two hardwired smoke alarms were replaced on the same visit.

Malvern #565 · September 2026

A three-phase board. Nine circuits moved onto their own Hager RCBOs, including a three-pole RCBO for the three-phase circuit, with a new 80A main switch. It was booked as a full day.

Croydon Park #799 · September 2026

The old enclosure came out. A new enclosure and main switch went in, every circuit was re-terminated and sleeved, and a new main earth stake was driven and tested.

Kensington Gardens #762 · October 2026

A shed sub-board with ceramic fuses and an old four-pole safety switch, fed from an RCBO in the house: two safety switches in a row. The shed got a new enclosure, a main switch and its own RCBOs for lights and power, fed from a new breaker in the house board.

Windsor Gardens meter box with the new RCBOs labelled and the Amped Up sticker on the board
Windsor Gardens #630
Royston Park switchboard after the upgrade, every circuit on its own RCBO and labelled
Royston Park #427
New switchboard enclosure in Croydon Park with the cover open showing the RCBOs
Croydon Park #799
Finished switchboard in West Lakes with Hager RCBOs and a new main switch
West Lakes #41
New shed sub-board in Kensington Gardens with the cover closed
Kensington Gardens #762
Hardwired smoke alarm replaced during the Windsor Gardens switchboard upgrade
Windsor Gardens #630, smoke alarm
Finished three-phase Hager switchboard with every circuit labelled
Three-phase Hager board

Watch a switchboard upgrade

Short clips filmed on real jobs.

More real jobs on TikTok @adelaideelectrician

What a switchboard customer said

★★★★★

Good fast service, turns up when he says he’s going to , and gets the job done quickly and professionally, fans replaced and new switchboard installed.

Mark, Royston Park Google review · September 2026

Read all 93 Google reviews

Switchboard warranty and paperwork

The full terms are on the warranty page.

How to get a written quote for a switchboard upgrade

Send them through the quote page or text them to 0468 008 822. You get a written quote with each item listed. If I need to see the board first, I will tell you.

Switchboard upgrade questions

Fuse box vs switchboard: what is the difference?

They are the same thing in the same spot. People say "fuse box" because older boards used fuses. A ceramic fuse has a thin wire inside that melts when a circuit is overloaded. A modern switchboard uses circuit breakers instead, and safety switches that cut the power if current leaks to earth. If your board still has fuses you pull out, those circuits have no safety switch protection.

Why do I need a switchboard upgrade?

Usually for one of three reasons. The board has no safety switch protection, or not enough. Something on it is failing, like a breaker that has run hot. Or there is no room for what you want to add, such as solar, a battery, an EV charger or a new oven. If none of those apply, you may not need one. I can usually tell you from your photos.

Can you add RCBOs to my existing board instead of replacing it?

Often, yes. If the enclosure is sound and has room, I swap the old breakers for RCBOs and fit a new main switch. That is what we did in Royston Park (#427) and Glengowrie (#612). If the enclosure is open, damaged, full or on a suspect backing panel, it gets replaced.

Will my power be off all day?

No. On a recent upgrade in Erindale (#648) the power was off for up to two hours of a five-hour visit. A fridge and freezer are fine for that long with the doors shut. Your wifi will drop, so plan around it if you work from home. A big three-phase board takes longer. I tell you how long before I start.

Does SA Power Networks need to be involved?

Only for some jobs. If the mains cable or the meter needs work, SA Power Networks is part of the disconnection and reconnection. That happened in Edwardstown (#233A), where the mains cable was upgraded and the meter moved outside. Your written quote says whether your job needs it.

What if my board is on an asbestos panel?

Some older Adelaide boards are mounted on a panel that may contain asbestos. That cannot be told from a photo, so I do not guess. In Prospect (#317) the old Scott board sat on an asbestos panel. It was removed under control and disposed of lawfully, and the new board went into a fire-rated enclosure.

Do you check smoke alarms and safety switches on the same visit?

Yes. While I am there I check your smoke alarms and test your safety switches. If an alarm needs replacing, I tell you, and it can be done on the same visit, as in Windsor Gardens (#630).

Want the long read?

The switchboard upgrade guide for Adelaide homes goes deeper on the rules and what changes the scope. Related work:

Ready to get your switchboard sorted?

Text photos of your board for a written quote, or tell us what you need.

Get a written quote Contact us

Call 0468 008 822